Section 4 :Project Management Methods and Tools (Detailed Project Specification)
- Josh Roberts
- Apr 2, 2019
- 2 min read
Updated: Apr 3, 2019
Work breakdown and schedule (Gantt Chart)
While working on my artefact I tried to keep every process to a minimum of two days however I was unable to do this and some steps overlapped or even extended for four or five days sometimes which was not expected however I had enough time to work around these problems. I started planning how every day wound go in January so that I can begin working on the artefact from the first of February and hopefully finish by the end.
Basic logo sketch
This was a very short process since I was collaboration to create my logo therefore, I just needed to sketch roughly what I would like my logo to look like and therefore it should not take more than one working day
creation of social media accounts
This is also a very short task and shouldn’t take longer than two days
website site map
This is a process which plans how the website would flow from home to finish and was a diagram therefore it should take only one day at most
website wire framing
This is a process where a blank layout of pages would be designed therefore it may take a relatively long time however I do not expect this process to take longer than three days
page designs
since the wire frames would already layout how the pages would look and be laid out putting them together should be a bit easier and therefore I do not expect this process to be more than two to three days
creation of pages
After designing the pages and making the wire frames coding these pages should not take more than four days however I do expect this process to be tedious and therefore these days may not be enough but I think its very possible within this time period
testing
testing the pages created should take no longer than two days because they were already created, and the website builder should help with ensuring they work properly and are bug free
editing and implementation of pages
this process is a fairly long one due to the fact that the pages would be refined and linked together as they will be when the website is published therefore this process is expected to take up to a week at most, so I have set aside a fairly long period amount of time for this
testing usability
I would be assisted by classmates to test the different pages just to ensure nothing is missing or wrong so I have set aside three days as I do not think any ore would be required
tweaking and fixing minor issues
I have set aside four days for this because I expect positive criticism and feedback from the persons who help with the testing and most of the suggestions and feedback given would be taken into account and the website would be improved upon
second testing
This should be the last time that the site would be tested and I hope it would be error free and ready to be presented at this point however additional work can still be done even if other suggestions are made
Gantt Charts

Needs / SWOT analysis

Risk Assessment